Installation & erection
Sequencing, rigging plans and field issues
Erection planned before the first truck leaves, and somebody to call when the hole is not where the drawing said it would be.
At a glance
- Planning
- Sequence and crane study
- Rigging
- Lift plans and hardware
- Field
- Issue resolution on call
- Safety
- Site-specific method statement
What it covers
- Erection sequence drawings
- Crane selection and pick plans
- Bearing and grout details
- Field fix authorisation
Start with the spec
Send dimensions, load rating and delivery region. Our engineers answer with a real quote and a real lead time, usually inside a day.