Under construction
—Engineering

Design & detailing
Shop drawings and submittal sets

Detailing done by people who know what a plant can strip, so the drawing that gets approved is the drawing that gets cast.

At a glance

Output
Shop drawings, submittals, details
Format
PDF, DWG, DXF
Revisions
Two rounds included
Turnaround
5 to 15 working days

What it covers

  • Piece drawings with marks
  • Reinforcement schedules
  • Embed and insert layouts
  • Erection drawings

Start with the spec

Send dimensions, load rating and delivery region. Our engineers answer with a real quote and a real lead time, usually inside a day.