Under construction
—Engineering

PE services
Sealed calculations and stamped drawings

Licensed sealing in the state the job is in, with the calculation package behind it rather than just a stamp on the last sheet.

At a glance

States
14 and growing
Scope
Calculations and seals
Package
Calcs, drawings, letter
Turnaround
5 to 10 working days

What it covers

  • Structural calculations
  • Handling and erection checks
  • Sealed shop drawings
  • Deferred submittal packages

Start with the spec

Send dimensions, load rating and delivery region. Our engineers answer with a real quote and a real lead time, usually inside a day.